Dream City Promenade: an independent profile of the Kuldzhinsky Trakt project
Dream City Promenade is a business-class cluster by BI Group on Kuldzhinsky Trakt in Almaty's Medeu district, next to the planned Almaty Promenade public space. According to Krisha.kz, it consists of 5-story buildings with 277 apartments, due for completion in Q2 2028. As of the date checked, the project has no permits to take buyers' money. This is a reference profile; I don't represent the developer.
Where Dream City Promenade is located
The project is on Kuldzhinsky Trakt in Medeu district, at the eastern entrance to the city. It belongs to BI Group's Dream City line, which is building several clusters in this part of Almaty.
The name refers to Almaty Promenade. According to an akimat announcement reported by bes.media on June 2, 2026, this is a planned public space in the Eastern Gate polycenter covering about 30 ha, with canals, embankments, hotels and leisure areas, scheduled for 2026–2029 with private investment. Today it's a plan, not working infrastructure.
What the project promises
According to Krisha.kz: 5 floors, 277 apartments, a monolithic concrete frame, underground parking, central heating. BI Group adds 3–3.3 m ceilings, apartments of 1 to 4 rooms from 41 to 125 m², and a pre-finish or full renovation with a fitted bathroom.
Facades of travertine, fiber-reinforced concrete and decorative metal panels, Acoustic Pro sound insulation, uPVC windows. The courtyard is closed and car-free, with a gazebo and waterfall, playgrounds, workout and barbecue areas and a security post. Entrances have through-passages and step-free access, windows have child safety locks, and doors have electric locks.
Commercial units
On the ground floors, along an open pedestrian promenade leading to the Almaty Promenade canal, the developer plans units of 61 to 350 m² with ceilings from 3 to 4.2 m. Their returns depend directly on when and in what form the city builds the Promenade itself.
Document status and why it matters
As of October 26, 2026, Krisha.kz states that there are no documents for the complex and the developer has no permits for shared construction. BI Group's own page says the information is published to gauge demand, not to raise money.
So paying for a reservation or a preliminary agreement at this stage is risky. A developer can legally take buyers' money under a standard DDU with a guarantee from the Single Operator, Kazakhstan Housing Company (KZhK), or after the akimat grants permission. Prices had not been published as of the date checked.
What I check at Dream City Promenade
- Whether a construction permit and a Single Operator guarantee have appeared.
- Registration of the standard DDU and the completion date stated in it.
- Which amenities work today: schools, shops, transport.
- The rush-hour drive to the center along Kuldzhinsky Trakt.
- The Almaty Promenade timeline according to akimat documents, not advertising.
- What the full renovation includes, if you choose that option.
Who the project suits
The project may appeal to people who want a low-rise business-class building for less than the foothills and are willing to wait for the eastern part of the city to develop. An investment here is largely a bet that Almaty Promenade gets built on time. I would only buy in once the documents appear, and with a buffer on the timeline.
Assess the project before sales start
Tell me what interests you: an apartment or a commercial unit. I'll track the documents and run scenarios that account for the Almaty Promenade timeline.
Message on WhatsAppQuestions and answers
When will Dream City Promenade be completed?
According to Krisha.kz, in Q2 2028. The developer's page doesn't give a date.
Can I buy an apartment in Dream City Promenade yet?
As of 26.10.2026, Krisha.kz reports no shared-construction documents, and BI Group says the information is published to gauge demand. Only pay under a DDU (shared-construction agreement) after a Single Operator guarantee or akimat permission.
What is Almaty Promenade?
It's an Almaty akimat project in the Eastern Gate polycenter in Medeu district: about 30 ha with canals, embankments and leisure areas, scheduled for 2026–2029. As of the date checked it's a plan, not a finished space.
What apartments will Dream City Promenade have?
According to BI Group, 1 to 4 rooms from 41 to 125 m², 3–3.3 m ceilings, pre-finish or full renovation.
How many floors does Dream City Promenade have?
Five. According to Krisha.kz, the project has 277 apartments and underground parking.
